18992990 |
Moon DH, Wazne M, Koutsospyros A, Christodoulatos C, Gevgilili H, Malik M, Kalyon DM: Evaluation of the treatment of chromite ore processing residue by ferrous sulfate and asphalt. J Hazard Mater. 2009 Jul 15;166(1):27-32. Epub 2008 Sep 27.
XANES analyses results showed that more than 75% Cr (6+) reduction was achieved upon pretreatment with ferrous sulfate. |
82(1,1,1,2) |
Details |
17275184 |
Moon DH, Wazne M, Dermatas D, Christodoulatos C, Sanchez AM, Grubb DG, Chrysochoou M, Kim MG: Long-term treatment issues with chromite ore processing residue (COPR): Cr (6+) reduction and heave. J Hazard Mater. 2007 May 17;143(3):629-35. Epub 2007 Jan 9.
A pugmill treatability study was conducted to remediate chromite ore processing residue (COPR) using ferrous sulfate heptahydrate (FeSO (4) x 7H (2) O) as a reductant. |
3(0,0,0,3) |
Details |